General
Year: 1997
Manufacturer: BEECHCRAFT
Model: KING AIR 350
Serial Number: FL-165
Condition: Used
Registration #: N165TG
Based at: SCX
Description: June 2025 – Phase 2 Inspection by ATS, Oneida, TN
No Known Damage History
Complete and Consecutive Logs
Managed and Operated by Big South Fork Jet, Scott Municipal Airport, TN
Complete Electronic Aircraft Record file by Blue Tail
Airframe
Total Time: 10,845
Total Landings: 8,140
Engine 1
Engine 1 Make/Model: PRATT & WHITNEY PT6A-60A
Engine 1 Serial Number: PCE-PK0056
Engine 1 Time: 10,219 SNEW
Engine 1 TBO: 3600
Engine 1 Cycles: 7,396
Engine 2
Engine 2 Make/Model: PRATT & WHITNEY PT6A-60A
Engine 2 Serial Number: PCE-PK002
Engine 2 Time: 10,357 SNEW
Engine 2 TBO: 3600
Engine 2 Cycles: 7,580
Props
Prop 1 Manufacturer: HARTZELL
Prop 1 Model: HC-B4MP-3C
Prop 1 Time: 1184 SOH
Prop 2 Manufacturer: HARTZELL
Prop 2 Model: HC-B4MP-3
Prop 2 Time: 969 SOH
Avionics
Avionics/Radios: Collins ADF-60A
Collins ALI-80A (encoding)
Collins APS-65J Autopilot
Collins Pro Line II Avionics Package
Dual Collins VHF-22C w/8.33kHZ spacing
L3 FA2100 CVR
Dual Collins DME-42
Collins EFIS-85 3-tube
Dual Universal UNS-1C FMS
Dual Collins MCS-65 HSI
Dual Collins VIR-32 Navigation Radios
Collins ALT-55B Radar Altimeter
Dual Collins RMI-30
AirCell ST-4200 w/router SATCOM
L3 WX-1000E Stormscope
Honeywell Mark VI EGPWS
Honeywell CAS-66A TCAS-1
Dual FreeFlight FDL-1090TX Transponder
Collins WXR-840 (color) Weather Radar
Additional Equipment
Additional Equipment: ADS-B Capable
Brake De-Ice
Raisbeck Mods
Exterior
Exterior Notes: Overall Finish White
Detail Finish Black and Gold Accent Stripes
Interior
Interior Notes: Passengers Executive: 8 Passengers
Air Conditioning: Aft
General: Standard Earth-Toned Interior
Seating: Sable Brown Seating
Cabinetry/Wood: Forward Left Side Upright Cabinet, Mid-
Cabin & Right Side Pyramid Cabinets
Accessories: Aft Baggage Curtain
Inspection Status
Inspection Status: Phase 1 Inspection
Complied With May 2024 @ 10,524.1 hours
Next Due December 2026 @ 11,022.2 hours
Phase 2 Inspection
Complied With June 2025 @ 10760.1 hours
Next Due December 2026 @ 11,222.2 hours
Phase 3 Inspection
Complied With December 2025 @ 10,880.0 hours
Next Due December 2027 @ 11,422.2 hours
Phase 4 Inspection
Complied With December 2025 @ 10,822.2 hours
Next Due December 2027 @ 11,622.2 hours
Landing Gear OVH
Complied With August 2021 @ 7,708.0 hours
Next Due August 2027 @ 15,708.0 hours
LH Engine Hot Section Inspection
Complied With 8,605.6 hours
Next Due 10,405.6 hours
LH Engine Overhaul
Complied With 7,095.4 hours
Next Due 10,695.4 hours
RH Engine Hot Section Inspection
Complied With 8,743.7 hours
Next Due 10,543.7 hours
RH Engine Overhaul
Complied With 7,233.5 hours
Next Due 10,833.5 hours
LH Propeller Overhaul
Complied With May 2021 @ 8,091.6 hours
Next Due May 2026 @ 11,091.6 hours
RH Propeller Overhaul
Complied With September 2022 @ 9,894.2
Next Due September 2027 @ 12,894.2 hours
USD $1,950,000